<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Project - Kỹ thuật điện Trần Lê</title>
	<atom:link href="https://e-tranle.vn/en/project/feed/" rel="self" type="application/rss+xml" />
	<link>https://e-tranle.vn/en/project/</link>
	<description>Giải pháp Năng Lượng Điện</description>
	<lastBuildDate>Mon, 15 Nov 2021 04:42:20 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://e-tranle.vn/wp-content/uploads/2021/11/cropped-logo-32x32.png</url>
	<title>Project - Kỹ thuật điện Trần Lê</title>
	<link>https://e-tranle.vn/en/project/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Green Farm Project in Cu Chi</title>
		<link>https://e-tranle.vn/en/project/green-farm-project-in-cu-chi/</link>
		
		<dc:creator><![CDATA[Trần Đình Quân]]></dc:creator>
		<pubDate>Wed, 03 Nov 2021 08:12:09 +0000</pubDate>
				<guid isPermaLink="false">https://e-tranle.vn/du-an/du-an-nong-trai-xanh-tai-cu-chi/</guid>

					<description><![CDATA[With the desire to create clean and safe products for health, but limited by the power source for irrigation. The investor wants to use 100% solar energy to supply electricity for loads including: 2 pumps with 2 horses each, electric [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>With the desire to create clean and safe products for health, but limited by the power source for irrigation. The investor wants to use 100% solar energy to supply electricity for loads including: 2 pumps with 2 horses each, electric stoves and common household appliances. A team of engineers Tran Le surveyed and consulted the investor of a solar power system with a capacity of 6 KWp panels combined with a hybrid inverter with a capacity of 5kW  and a Lithium storage battery system with a capacity of 11.6kWh.</p>
<p><a href="https://e-tranle.vn/wp-content/uploads/2021/11/aiogiathy.jpg"><img fetchpriority="high" decoding="async" class="wp-image-2496 size-large aligncenter" src="https://e-tranle.vn/wp-content/uploads/2021/11/aiogiathy-1024x576.jpg" alt="" width="1024" height="576" srcset="https://e-tranle.vn/wp-content/uploads/2021/11/aiogiathy-1024x576.jpg 1024w, https://e-tranle.vn/wp-content/uploads/2021/11/aiogiathy-300x169.jpg 300w, https://e-tranle.vn/wp-content/uploads/2021/11/aiogiathy-768x432.jpg 768w, https://e-tranle.vn/wp-content/uploads/2021/11/aiogiathy-1536x864.jpg 1536w, https://e-tranle.vn/wp-content/uploads/2021/11/aiogiathy-600x338.jpg 600w, https://e-tranle.vn/wp-content/uploads/2021/11/aiogiathy.jpg 1920w" sizes="(max-width: 1024px) 100vw, 1024px" /></a></p>
<p style="text-align: center;">Green farm project in Cu Chi</p>
<p><a href="https://e-tranle.vn/wp-content/uploads/2021/11/aiogiathy1.jpg"><img decoding="async" class="wp-image-2498 size-large aligncenter" src="https://e-tranle.vn/wp-content/uploads/2021/11/aiogiathy1-1024x576.jpg" alt="" width="1024" height="576" srcset="https://e-tranle.vn/wp-content/uploads/2021/11/aiogiathy1-1024x576.jpg 1024w, https://e-tranle.vn/wp-content/uploads/2021/11/aiogiathy1-300x169.jpg 300w, https://e-tranle.vn/wp-content/uploads/2021/11/aiogiathy1-768x432.jpg 768w, https://e-tranle.vn/wp-content/uploads/2021/11/aiogiathy1-1536x864.jpg 1536w, https://e-tranle.vn/wp-content/uploads/2021/11/aiogiathy1-600x338.jpg 600w, https://e-tranle.vn/wp-content/uploads/2021/11/aiogiathy1.jpg 1920w" sizes="(max-width: 1024px) 100vw, 1024px" /></a></p>
<p style="text-align: center;">Green farm project in Cu Chi</p>
<p><a href="https://e-tranle.vn/wp-content/uploads/2021/11/aiogiathy4.jpg"><img decoding="async" class="wp-image-2527 size-full aligncenter" src="https://e-tranle.vn/wp-content/uploads/2021/11/aiogiathy4.jpg" alt="" width="1200" height="1000" srcset="https://e-tranle.vn/wp-content/uploads/2021/11/aiogiathy4.jpg 1200w, https://e-tranle.vn/wp-content/uploads/2021/11/aiogiathy4-300x250.jpg 300w, https://e-tranle.vn/wp-content/uploads/2021/11/aiogiathy4-1024x853.jpg 1024w, https://e-tranle.vn/wp-content/uploads/2021/11/aiogiathy4-768x640.jpg 768w, https://e-tranle.vn/wp-content/uploads/2021/11/aiogiathy4-600x500.jpg 600w" sizes="(max-width: 1200px) 100vw, 1200px" /></a></p>
<p style="text-align: center;">
<p style="text-align: center;">GoodWe Inverter storage and 2 GS Energy storage batteries</p>
<p>System specs:</p>
<ul>
<li>Total solar battery capacity: 6 kWh, using 14 Sunpower 475Wp solar panels.</li>
<li>Inverter power: 5 Kw, using GoodWe Hybrid Inverter.</li>
<li>Storage battery capacity: 11.6 kWh by GS Energy.</li>
<li>Electric energy produced daily from 12-15 kWh.</li>
</ul>
<p>The product was designed by Tran Le Electrical Engineering Co., Ltd., provided with construction materials, completed and put into use in October 2021.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Solar power system connected to the grid 8.88KWp &#8211; Lai Thieu, Binh Duong</title>
		<link>https://e-tranle.vn/en/project/he-thong-dien-nang-luong-mat-troi-hoa-luoi-8-88kwp-lai-thieu-binh-duong/</link>
		
		<dc:creator><![CDATA[quantriweb]]></dc:creator>
		<pubDate>Sat, 30 Oct 2021 06:50:54 +0000</pubDate>
				<guid isPermaLink="false">https://e-tranle.vn/du-an/he-thong-dien-nang-luong-mat-troi-hoa-luoi-8-88kwp-lai-thieu-binh-duong/</guid>

					<description><![CDATA[The 8.88KWp grid-tied solar power system project is located in Lai Thieu Ward, TX. Thuan An, District Binh Duong. The investor wants to save monthly electricity costs as well as use green, clean energy to reduce the temperature inside the [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>The 8.88KWp grid-tied solar power system project is located in Lai Thieu Ward, TX. Thuan An, District Binh Duong. The investor wants to save monthly electricity costs as well as use green, clean energy to reduce the temperature inside the house. In order to meet that requirement, Tran Le engineers have researched, designed and provided investment and technical advice to the Investor. The investor has decided to invest in a solar power system with a capacity of 8.88KWp.</p>
<p>Project information:</p>
<p>Project name: Solar power system connected to the grid 8.88KWp – Lai Thieu, Binh Duong.<br />
Location: Lai Thieu Ward, TX. Thuan An, District Binh Duong.<br />
Power: 8.88KWp<br />
Completed: June 2019.</p>
<p>The system uses Mono 72 Cell 370Wp 1000V solar panels manufactured by S-Energy / Korea.</p>
<p><img loading="lazy" decoding="async" class="aligncenter wp-image-557 size-full tie-appear lazyloaded" src="https://e-tranle.vn/wp-content/uploads/khung-mau-hinh-bai-viet.jpg" sizes="(max-width: 800px) 100vw, 800px" srcset="https://e-tranle.vn/wp-content/uploads/khung-mau-hinh-bai-viet.jpg 800w, https://e-tranle.vn/wp-content/uploads/khung-mau-hinh-bai-viet-768x576.jpg 768w" alt="" width="800" height="600" data-ll-status="loaded" /></p>
<p>The plan to arrange the panels in the East-West angle to optimize the area and ensure aesthetics while still giving high performance.</p>
<p><img loading="lazy" decoding="async" class="aligncenter wp-image-558 size-full lazyloaded tie-appear" src="https://e-tranle.vn/wp-content/uploads/Pin-NLMT-Ap-mai.jpg" sizes="(max-width: 800px) 100vw, 800px" srcset="https://e-tranle.vn/wp-content/uploads/Pin-NLMT-Ap-mai.jpg 800w, https://e-tranle.vn/wp-content/uploads/Pin-NLMT-Ap-mai-768x576.jpg 768w" alt="" width="800" height="600" data-ll-status="loaded" /></p>
<p>The inverter cluster includes 2 3P-10kW Sunny Tripower grid-tied inverters manufactured by SMA (Germany).</p>
<p><img loading="lazy" decoding="async" class="aligncenter wp-image-556 size-full lazyloaded tie-appear" src="https://e-tranle.vn/wp-content/uploads/Inverter-SMA.jpg" sizes="(max-width: 800px) 100vw, 800px" srcset="https://e-tranle.vn/wp-content/uploads/Inverter-SMA.jpg 800w, https://e-tranle.vn/wp-content/uploads/Inverter-SMA-768x576.jpg 768w" alt="" width="800" height="600" data-ll-status="loaded" /></p>
<p>The project was designed, supplied and built by Tran Le Electrical Engineering Co., Ltd., completed and tested in June 2019.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>583KWp grid-tied solar power system – Tan Phu, Ho Chi Minh City</title>
		<link>https://e-tranle.vn/en/project/he-thong-dien-nang-luong-mat-troi-hoa-luoi-583kwp-tan-phu-tp-ho-chi-minh/</link>
		
		<dc:creator><![CDATA[quantriweb]]></dc:creator>
		<pubDate>Sat, 30 Oct 2021 06:50:27 +0000</pubDate>
				<guid isPermaLink="false">https://e-tranle.vn/du-an/he-thong-dien-nang-luong-mat-troi-hoa-luoi-583kwp-tan-phu-tp-ho-chi-minh/</guid>

					<description><![CDATA[The 583KWp grid-tied solar power system project is located at Le Trong Tan Street, Tay Thanh Ward, Tan Phu District, Ho Chi Minh City. Project information: Project name: Solar power system connected to the grid 583 KWp – Tan Phu [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>The 583KWp grid-tied solar power system project is located at Le Trong Tan Street, Tay Thanh Ward, Tan Phu District, Ho Chi Minh City.</p>
<div id="attachment_1512" style="width: 810px" class="wp-caption aligncenter"><a href="https://e-tranle.vn/wp-content/uploads/2021/10/Du-an-nang-luong-mat-troi-tan-phu-hcm-1.jpg"><img loading="lazy" decoding="async" aria-describedby="caption-attachment-1512" class="size-full wp-image-1512" src="https://e-tranle.vn/wp-content/uploads/2021/10/Du-an-nang-luong-mat-troi-tan-phu-hcm-1.jpg" alt="" width="800" height="600" srcset="https://e-tranle.vn/wp-content/uploads/2021/10/Du-an-nang-luong-mat-troi-tan-phu-hcm-1.jpg 800w, https://e-tranle.vn/wp-content/uploads/2021/10/Du-an-nang-luong-mat-troi-tan-phu-hcm-1-300x225.jpg 300w, https://e-tranle.vn/wp-content/uploads/2021/10/Du-an-nang-luong-mat-troi-tan-phu-hcm-1-768x576.jpg 768w, https://e-tranle.vn/wp-content/uploads/2021/10/Du-an-nang-luong-mat-troi-tan-phu-hcm-1-600x450.jpg 600w" sizes="(max-width: 800px) 100vw, 800px" /></a><p id="caption-attachment-1512" class="wp-caption-text">Solar power system connected to the grid 583KWp Le Trong Tan Street, Tan Phu District.</p></div>
<p>Project information:</p>
<p>Project name: Solar power system connected to the grid 583 KWp – Tan Phu District, City. Ho Chi Minh City<br />
Address: Le Trong Tan Street, Tay Thanh Ward, Tan Phu District, Ho Chi Minh City.<br />
Power: 583 KWp.<br />
Solar Panels: Sunpower 405Wp.<br />
Inverter: Solis 110 KW.<br />
Completion: December 2020.</p>
<p>The investor wants to save monthly electricity costs as well as use green, clean energy to reduce the temperature inside the house.</p>
<p>Tran Le engineers have researched, designed, and provided investment and technical advice to the Investor. The investor has decided to invest in a solar power system with a capacity of 583 KWp.</p>
<p>The project uses solar panels with a capacity of 405kWp &#8211; Sunpower &#8211; The leading solar battery company in Germany.</p>
<p><a href="https://e-tranle.vn/wp-content/uploads/2021/10/Du-an-nang-luong-mat-troi-tan-phu-hcm-3.jpg"><img loading="lazy" decoding="async" class="size-full wp-image-1514 aligncenter" src="https://e-tranle.vn/wp-content/uploads/2021/10/Du-an-nang-luong-mat-troi-tan-phu-hcm-3.jpg" alt="" width="800" height="600" srcset="https://e-tranle.vn/wp-content/uploads/2021/10/Du-an-nang-luong-mat-troi-tan-phu-hcm-3.jpg 800w, https://e-tranle.vn/wp-content/uploads/2021/10/Du-an-nang-luong-mat-troi-tan-phu-hcm-3-300x225.jpg 300w, https://e-tranle.vn/wp-content/uploads/2021/10/Du-an-nang-luong-mat-troi-tan-phu-hcm-3-768x576.jpg 768w, https://e-tranle.vn/wp-content/uploads/2021/10/Du-an-nang-luong-mat-troi-tan-phu-hcm-3-600x450.jpg 600w" sizes="(max-width: 800px) 100vw, 800px" /></a></p>
<p><a href="https://e-tranle.vn/wp-content/uploads/2021/10/Du-an-nang-luong-mat-troi-tan-phu-hcm-2.jpg"><img loading="lazy" decoding="async" class="size-full wp-image-1516 aligncenter" src="https://e-tranle.vn/wp-content/uploads/2021/10/Du-an-nang-luong-mat-troi-tan-phu-hcm-2.jpg" alt="" width="800" height="600" srcset="https://e-tranle.vn/wp-content/uploads/2021/10/Du-an-nang-luong-mat-troi-tan-phu-hcm-2.jpg 800w, https://e-tranle.vn/wp-content/uploads/2021/10/Du-an-nang-luong-mat-troi-tan-phu-hcm-2-300x225.jpg 300w, https://e-tranle.vn/wp-content/uploads/2021/10/Du-an-nang-luong-mat-troi-tan-phu-hcm-2-768x576.jpg 768w, https://e-tranle.vn/wp-content/uploads/2021/10/Du-an-nang-luong-mat-troi-tan-phu-hcm-2-600x450.jpg 600w" sizes="(max-width: 800px) 100vw, 800px" /></a></p>
<p>The project was designed by  Tran Le Electrical Engineering Co., Ltd., supplied materials, built a package, completed and put into use in December 2020.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>250kVA Substation Factory – Huynh Gia Agriculture Joint Stock Company.</title>
		<link>https://e-tranle.vn/en/project/tram-bien-ap-250kva-nha-may-san-xuat-cong-ty-co-phan-nong-nghiep-huynh-gia/</link>
		
		<dc:creator><![CDATA[quantriweb]]></dc:creator>
		<pubDate>Sat, 30 Oct 2021 06:49:36 +0000</pubDate>
				<guid isPermaLink="false">https://e-tranle.vn/du-an/tram-bien-ap-250kva-nha-may-san-xuat-cong-ty-co-phan-nong-nghiep-huynh-gia/</guid>

					<description><![CDATA[Project name:  Manufacturing factory – Huynh Gia Agriculture Joint Stock Company, category 250kVA power supply substation. The factory was started construction and put into operation in 2019. Project information: Project name: 3-Phase substation – 250kVA  – Manufacturing plant – Huynh [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>Project name:  Manufacturing factory – Huynh Gia Agriculture Joint Stock Company, category 250kVA power supply substation. The factory was started construction and put into operation in 2019.</p>
<p>Project information:</p>
<p>Project name: 3-Phase substation – 250kVA  – Manufacturing plant – Huynh Gia Agriculture Joint Stock Company.<br />
Construction location: Vinh Phu, Thuan An, T. Binh Duong, Vietnam.<br />
Substation capacity: 3 Phase 250 kVA Amorphous type.<br />
Completion date: December 2019.</p>
<p>Main items of 3-Phase substation – 250kVA Production plant – Huynh Gia Agriculture Joint Stock Company:</p>
<p>Part of substation 3 Phase &#8211; 250 kVA includes:</p>
<p>+ Lightning protection equipment, switchgear, medium voltage underground cable system, low voltage metering system.</p>
<p>+ Thibidi 250 kVA oil transformer Amorphuos type.</p>
<p>Electrical cabinet part:</p>
<p>The electrical cabinet system includes:</p>
<p>+ Distribution cabinet 1 module ATS 4P &#8211; 200A OSEMCO.</p>
<p>+ Capacitor cabinet with a 4-level module &#8211; 100 kVA: Mikro dry capacitor, Mikro 4-level compensation controller.</p>
<p>Project pictures:</p>
<p>3-Phase substation &#8211; 250 kVA placed on steel poles &#8211; saves space, ensures the beauty of the plant while still ensuring safety.</p>
<p><a href="https://e-tranle.vn/wp-content/uploads/2021/10/TRAM-BIEN-AP-250KVA-HUYNH-GIA-1.jpg"><img loading="lazy" decoding="async" class="aligncenter size-full wp-image-2139" src="https://e-tranle.vn/wp-content/uploads/2021/10/TRAM-BIEN-AP-250KVA-HUYNH-GIA-1.jpg" alt="" width="800" height="600" srcset="https://e-tranle.vn/wp-content/uploads/2021/10/TRAM-BIEN-AP-250KVA-HUYNH-GIA-1.jpg 800w, https://e-tranle.vn/wp-content/uploads/2021/10/TRAM-BIEN-AP-250KVA-HUYNH-GIA-1-300x225.jpg 300w, https://e-tranle.vn/wp-content/uploads/2021/10/TRAM-BIEN-AP-250KVA-HUYNH-GIA-1-768x576.jpg 768w, https://e-tranle.vn/wp-content/uploads/2021/10/TRAM-BIEN-AP-250KVA-HUYNH-GIA-1-600x450.jpg 600w" sizes="(max-width: 800px) 100vw, 800px" /></a></p>
<p>– The connection post uses lightning protection devices, switchgear</p>
<p><a href="https://e-tranle.vn/wp-content/uploads/2021/10/TRAM-BIEN-AP-250KVA-Tru-dau-noi.jpg"><img loading="lazy" decoding="async" class="aligncenter size-full wp-image-2140" src="https://e-tranle.vn/wp-content/uploads/2021/10/TRAM-BIEN-AP-250KVA-Tru-dau-noi.jpg" alt="" width="800" height="600" srcset="https://e-tranle.vn/wp-content/uploads/2021/10/TRAM-BIEN-AP-250KVA-Tru-dau-noi.jpg 800w, https://e-tranle.vn/wp-content/uploads/2021/10/TRAM-BIEN-AP-250KVA-Tru-dau-noi-300x225.jpg 300w, https://e-tranle.vn/wp-content/uploads/2021/10/TRAM-BIEN-AP-250KVA-Tru-dau-noi-768x576.jpg 768w, https://e-tranle.vn/wp-content/uploads/2021/10/TRAM-BIEN-AP-250KVA-Tru-dau-noi-600x450.jpg 600w" sizes="(max-width: 800px) 100vw, 800px" /></a></p>
<p>&#8211; Works using medium voltage underground cables across the road.</p>
<p><a href="https://e-tranle.vn/wp-content/uploads/2021/10/TRAM-BIEN-AP-250KVA-Tuyen-cap-ngam.jpg"><img loading="lazy" decoding="async" class="aligncenter size-full wp-image-2141" src="https://e-tranle.vn/wp-content/uploads/2021/10/TRAM-BIEN-AP-250KVA-Tuyen-cap-ngam.jpg" alt="" width="800" height="600" srcset="https://e-tranle.vn/wp-content/uploads/2021/10/TRAM-BIEN-AP-250KVA-Tuyen-cap-ngam.jpg 800w, https://e-tranle.vn/wp-content/uploads/2021/10/TRAM-BIEN-AP-250KVA-Tuyen-cap-ngam-300x225.jpg 300w, https://e-tranle.vn/wp-content/uploads/2021/10/TRAM-BIEN-AP-250KVA-Tuyen-cap-ngam-768x576.jpg 768w, https://e-tranle.vn/wp-content/uploads/2021/10/TRAM-BIEN-AP-250KVA-Tuyen-cap-ngam-600x450.jpg 600w" sizes="(max-width: 800px) 100vw, 800px" /></a></p>
<div class="entry-content">
<p>The project was designed by Tran Le Electrical Engineering Co., Ltd., designed, built and put into use in December 2019.</p>
</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>1000KVA transformer station Hiep Phat Long An Packaging Factory.</title>
		<link>https://e-tranle.vn/en/project/tram-bien-ap-1000kva-nha-may-bao-bi-hiep-phat-long-an/</link>
		
		<dc:creator><![CDATA[quantriweb]]></dc:creator>
		<pubDate>Sat, 30 Oct 2021 06:49:23 +0000</pubDate>
				<guid isPermaLink="false">https://e-tranle.vn/du-an/tram-bien-ap-1000kva-nha-may-bao-bi-hiep-phat-long-an/</guid>

					<description><![CDATA[Name of project: Packaging factory &#8211; Hiep Phat Long An Packaging Production &#8211; Trading Co., Ltd. The factory was started construction and put into operation in 2019. Project information: Project name: 1000kVA Substation Packaging factory – Hiep Phat Long An Packaging Production [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>Name of project:</p>
<p>Packaging factory &#8211; Hiep Phat Long An Packaging Production &#8211; Trading Co., Ltd.</p>
<p>The factory was started construction and put into operation in 2019.</p>
<p>Project information:</p>
<p>Project name: 1000kVA Substation Packaging factory – Hiep Phat Long An Packaging Production &#8211; Trading Co., Ltd.<br />
Construction location: Tan Industrial Park, Tan Kim Ward, Can Giuoc Dist., Long An Town, Vietnam.<br />
Substation capacity: 1000 kVA.<br />
Completion date: October 2019.</p>
<p>Main items of the project 1000kVA Substation Packaging Factory &#8211; Hiep Phat Long An Packaging Production &#8211; Trading Co., Ltd:</p>
<p>Part of 3P-1000 kVA substation includes:</p>
<p>+ Lightning protection equipment, switchgear, medium voltage metering system.</p>
<p>+ Shihlin 1000 kVA oil transformer Amorphuos type.</p>
<p>Electrical cabinet part: MSB 2-module electrical cabinet system includes:</p>
<p>+ Main module ACB Metasol 3P-1600A / 65KA Fixed type – LS Vina.</p>
<p>+ Capacitor module 8 levels &#8211; 400 kVA: Mikro dry capacitor, Mikro 8-level compensation controller.</p>
<p>Project Pictures:</p>
<div id="attachment_1775" style="width: 810px" class="wp-caption aligncenter"><a href="https://e-tranle.vn/wp-content/uploads/2021/10/TRAM-BIEN-AP-1000KVA-LA.jpg"><img loading="lazy" decoding="async" aria-describedby="caption-attachment-1775" class="size-full wp-image-2131" src="https://e-tranle.vn/wp-content/uploads/2021/10/TRAM-BIEN-AP-1000KVA-LA.jpg" alt="" width="800" height="600" srcset="https://e-tranle.vn/wp-content/uploads/2021/10/TRAM-BIEN-AP-1000KVA-LA.jpg 800w, https://e-tranle.vn/wp-content/uploads/2021/10/TRAM-BIEN-AP-1000KVA-LA-300x225.jpg 300w, https://e-tranle.vn/wp-content/uploads/2021/10/TRAM-BIEN-AP-1000KVA-LA-768x576.jpg 768w, https://e-tranle.vn/wp-content/uploads/2021/10/TRAM-BIEN-AP-1000KVA-LA-600x450.jpg 600w" sizes="(max-width: 800px) 100vw, 800px" /></a><p id="caption-attachment-1775" class="wp-caption-text">Project overview 1000kVA substation &#8211; Hiep Phat Long An Packaging Factory.</p></div>
<div id="attachment_1777" style="width: 810px" class="wp-caption aligncenter"><a href="https://e-tranle.vn/wp-content/uploads/2021/10/TRAM-BIEN-AP-1000KVA-MSB.jpg"><img loading="lazy" decoding="async" aria-describedby="caption-attachment-1777" class="size-full wp-image-2133" src="https://e-tranle.vn/wp-content/uploads/2021/10/TRAM-BIEN-AP-1000KVA-MSB.jpg" alt="" width="800" height="600" srcset="https://e-tranle.vn/wp-content/uploads/2021/10/TRAM-BIEN-AP-1000KVA-MSB.jpg 800w, https://e-tranle.vn/wp-content/uploads/2021/10/TRAM-BIEN-AP-1000KVA-MSB-300x225.jpg 300w, https://e-tranle.vn/wp-content/uploads/2021/10/TRAM-BIEN-AP-1000KVA-MSB-768x576.jpg 768w, https://e-tranle.vn/wp-content/uploads/2021/10/TRAM-BIEN-AP-1000KVA-MSB-600x450.jpg 600w" sizes="(max-width: 800px) 100vw, 800px" /></a><p id="caption-attachment-1777" class="wp-caption-text">The 2-module MSB electrical cabinet system includes: Module ACB Metasol 3P-1600A / 65KA and Module Capacitor.</p></div>
<p>The project was designed by Tran Le Electrical Engineering Co., Ltd., designed, built and put into use in October 2019.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Solar power system 40KW-KS Phuong Nam Star</title>
		<link>https://e-tranle.vn/en/project/he-thong-dien-mat-troi-40kw-ks-ngoi-sao-phuong-nam/</link>
		
		<dc:creator><![CDATA[quantriweb]]></dc:creator>
		<pubDate>Sat, 30 Oct 2021 06:49:13 +0000</pubDate>
				<guid isPermaLink="false">https://e-tranle.vn/du-an/he-thong-dien-mat-troi-40kw-ks-ngoi-sao-phuong-nam/</guid>

					<description><![CDATA[Phuong Nam Star Hotel in District 12, Ho Chi Minh City is a 7-storey hotel, with a roof floor area of ​​240m2, the monthly electricity cost is about 40 million, with the desire to save electricity costs, reduce electricity costs. [&#8230;]]]></description>
										<content:encoded><![CDATA[<h4>Phuong Nam Star Hotel in District 12, Ho Chi Minh City is a 7-storey hotel, with a roof floor area of ​​240m2, the monthly electricity cost is about 40 million, with the desire to save electricity costs, reduce electricity costs. temperature inside the building and improve the image of the Hotel. After researching and receiving investment advice and technical advice from engineers, Tran Le, the hotel owner decided to invest in a 40KWp solar power system.<br />
Project information:<br />
Project name: Hotel solar power system NSPN 40KW<br />
Location: District 12, City. Ho Chi Minh<br />
Power: 40KWp<br />
Completed : July 2019<br />
The system uses 108 Mono 72 Cell 370Wp panels manufactured by S-Energy / Korea</h4>
<p><a href="https://e-tranle.vn/wp-content/uploads/2021/10/NSPN-1.jpg"><img loading="lazy" decoding="async" class="aligncenter size-full wp-image-2120" src="https://e-tranle.vn/wp-content/uploads/2021/10/NSPN-1.jpg" alt="" width="800" height="600" srcset="https://e-tranle.vn/wp-content/uploads/2021/10/NSPN-1.jpg 800w, https://e-tranle.vn/wp-content/uploads/2021/10/NSPN-1-300x225.jpg 300w, https://e-tranle.vn/wp-content/uploads/2021/10/NSPN-1-768x576.jpg 768w, https://e-tranle.vn/wp-content/uploads/2021/10/NSPN-1-600x450.jpg 600w" sizes="(max-width: 800px) 100vw, 800px" /></a></p>
<h3>The truss system is made from I-shaped steel and a 2.5 m high galvanized box to ensure the sturdiness, aesthetics and take advantage of the space below the solar panel truss. Optimize the area and ensure the aesthetics while still giving high performance.</h3>
<p><a href="https://e-tranle.vn/wp-content/uploads/2021/10/NSPN-3.jpg"><img loading="lazy" decoding="async" class="aligncenter size-full wp-image-2122" src="https://e-tranle.vn/wp-content/uploads/2021/10/NSPN-3.jpg" alt="" width="800" height="600" srcset="https://e-tranle.vn/wp-content/uploads/2021/10/NSPN-3.jpg 800w, https://e-tranle.vn/wp-content/uploads/2021/10/NSPN-3-300x225.jpg 300w, https://e-tranle.vn/wp-content/uploads/2021/10/NSPN-3-768x576.jpg 768w, https://e-tranle.vn/wp-content/uploads/2021/10/NSPN-3-600x450.jpg 600w" sizes="(max-width: 800px) 100vw, 800px" /></a></p>
<h3>The inverter cluster includes 2 REFUSol 20KW grid-tied inverters manufactured by REFU Elektronik GmbH. The DC cabinet protects each DC String with built-in DC lightning protection and the AC switchboard includes MCB and AC surge arrester.</h3>
<p><a href="https://e-tranle.vn/wp-content/uploads/2021/10/NSPN-2.jpg"><img loading="lazy" decoding="async" class="aligncenter size-full wp-image-2124" src="https://e-tranle.vn/wp-content/uploads/2021/10/NSPN-2.jpg" alt="" width="800" height="600" srcset="https://e-tranle.vn/wp-content/uploads/2021/10/NSPN-2.jpg 800w, https://e-tranle.vn/wp-content/uploads/2021/10/NSPN-2-300x225.jpg 300w, https://e-tranle.vn/wp-content/uploads/2021/10/NSPN-2-768x576.jpg 768w, https://e-tranle.vn/wp-content/uploads/2021/10/NSPN-2-600x450.jpg 600w" sizes="(max-width: 800px) 100vw, 800px" /></a></p>
<div class="entry-content">
<h3>The project was designed, supplied and built by  Tran Le Electrical Engineering Co., Ltd., completed and tested in July 2019.</h3>
</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>1250KVA Substation HSF-VSIP2-Binh Duong Factory</title>
		<link>https://e-tranle.vn/en/project/tram-bien-ap-1250kva-nha-may-hsf-vsip2-binh-duong/</link>
		
		<dc:creator><![CDATA[Trần Đình Quân]]></dc:creator>
		<pubDate>Sat, 30 Oct 2021 06:48:30 +0000</pubDate>
				<guid isPermaLink="false">https://e-tranle.vn/du-an/tram-bien-ap-1250kva-nha-may-hsf-vsip2-binh-duong/</guid>

					<description><![CDATA[HSF Binh Duong factory located in Vietnam &#8211; Singapore Industrial Park II-A, Tan Binh Commune, Bac Tan Uyen District, Binh Duong Province, Specializing in manufacturing furniture for export to international markets, the factory is invest in new construction in 2018 [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>HSF Binh Duong factory located in Vietnam &#8211; Singapore Industrial Park II-A, Tan Binh Commune, Bac Tan Uyen District, Binh Duong Province, Specializing in manufacturing furniture for export to international markets, the factory is invest in new construction in 2018 and put into operation in 2019.</p>
<h3>Project information :</h3>
<p>&#8211; Project name: 1250KVA transformer station HSF-Binh Duong factory<br />
-Location: VSIP2A Industrial Park, Binh Duong<br />
-Capacity: 1250KVA<br />
-Voltage level: 22/0.4kV<br />
-Completion date: September 2019</p>
<h3>The project uses 1250 amorphous superconducting steel core oil transformer manufactured by Shihlin Electric</h3>
<div id="attachment_491" class="wp-caption aligncenter">
<p><img loading="lazy" decoding="async" class="size-full wp-image-491 tie-appear lazyloaded" src="https://e-tranle.vn/wp-content/uploads/HSF-3a.jpg" sizes="(max-width: 800px) 100vw, 800px" srcset="https://e-tranle.vn/wp-content/uploads/HSF-3a.jpg 800w, https://e-tranle.vn/wp-content/uploads/HSF-3a-768x576.jpg 768w" alt="" width="800" height="600" aria-describedby="caption-attachment-491" data-ll-status="loaded" /></p>
<p id="caption-attachment-491" class="wp-caption-text">Amorphous transformer</p>
</div>
<h3>Switching, Protecting the medium voltage side of the Shneider RM6 medium voltage switchboard.</h3>
<div id="attachment_492" class="wp-caption aligncenter">
<p><img loading="lazy" decoding="async" class="size-full wp-image-492 tie-appear lazyloaded" src="https://e-tranle.vn/wp-content/uploads/HSF-1.jpg" sizes="(max-width: 800px) 100vw, 800px" srcset="https://e-tranle.vn/wp-content/uploads/HSF-1.jpg 800w, https://e-tranle.vn/wp-content/uploads/HSF-1-768x576.jpg 768w" alt="" width="800" height="600" aria-describedby="caption-attachment-492" data-ll-status="loaded" /></p>
<p id="caption-attachment-492" class="wp-caption-text">Substation HSF</p>
</div>
<h3>MSB electrical cabinet includes 1 ACB 2000A/65kA module, 1 500KVAr automatic compensation module, 1 distribution module</h3>
<div id="attachment_493" class="wp-caption aligncenter">
<p><img loading="lazy" decoding="async" class="size-full wp-image-493 lazyloaded tie-appear" src="https://e-tranle.vn/wp-content/uploads/HSF-2.jpg" sizes="(max-width: 800px) 100vw, 800px" srcset="https://e-tranle.vn/wp-content/uploads/HSF-2.jpg 800w, https://e-tranle.vn/wp-content/uploads/HSF-2-768x576.jpg 768w" alt="" width="800" height="600" aria-describedby="caption-attachment-493" data-ll-status="loaded" /></p>
<p id="caption-attachment-493" class="wp-caption-text">MSB . electrical cabinet</p>
</div>
<h3>Medium voltage indirect metering system installed on concrete pillars</h3>
<div id="attachment_494" class="wp-caption aligncenter">
<p><img loading="lazy" decoding="async" class="size-full wp-image-494 lazyloaded tie-appear" src="https://e-tranle.vn/wp-content/uploads/HSF-4.jpg" sizes="(max-width: 800px) 100vw, 800px" srcset="https://e-tranle.vn/wp-content/uploads/HSF-4.jpg 800w, https://e-tranle.vn/wp-content/uploads/HSF-4-768x576.jpg 768w" alt="" width="800" height="600" aria-describedby="caption-attachment-494" data-ll-status="loaded" /></p>
<p>Connection post</p>
<p>The project was designed by  Tran Le Electrical Engineering Co., Ltd  with a package of design &#8211; construction and energizing and put into use in September 2019.</p>
</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Transformer Sub-Station 1250KVA, Taiky Food Cu Chi Factory</title>
		<link>https://e-tranle.vn/en/project/transformer-sub-station-1250kva-taiky-food-cu-chi-factory/</link>
		
		<dc:creator><![CDATA[Trần Đình Quân]]></dc:creator>
		<pubDate>Sat, 30 Oct 2021 06:48:22 +0000</pubDate>
				<guid isPermaLink="false">https://e-tranle.vn/du-an/tram-bien-ap-1250kva-nha-may-bot-my-tai-ky-cu-chi/</guid>

					<description><![CDATA[Tai Ky flour factory located in Tan Phu Trung Industrial Park, Cu Chi district, is a factory for producing flour and flour products, newly built on a modern production line, products are sold domestically. and export. Project information : Project [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>Tai Ky flour factory located in Tan Phu Trung Industrial Park, Cu Chi district, is a factory for producing flour and flour products, newly built on a modern production line, products are sold domestically. and export.</p>
<h3>Project information :</h3>
<ul>
<li>Project name: 1250KVA substation Tai Ky flour factory</li>
<li>Location: Tan Phu Trung Industrial Park</li>
<li>Capacity: 1250KVA</li>
<li>Voltage level: 22/0.4kV</li>
<li>Completion date: August 2019</li>
</ul>
<h4>The substation part includes: RM6 switchboard for medium voltage protection, 1250KVA oil transformer, MSB electrical cabinet system includes: Main ACB Module 2000A + ATS 1000A, Distribution Module, Compensation Module 500KVAr.</h4>
<p><img loading="lazy" decoding="async" class="size-full wp-image-476 aligncenter tie-appear lazyloaded" src="https://e-tranle.vn/wp-content/uploads/TBA-Taiky_1.jpg" sizes="(max-width: 800px) 100vw, 800px" srcset="https://e-tranle.vn/wp-content/uploads/TBA-Taiky_1.jpg 800w, https://e-tranle.vn/wp-content/uploads/TBA-Taiky_1-768x576.jpg 768w" alt="" width="800" height="600" data-ll-status="loaded" /></p>
<h4>RM6 switchgear and protective switchgear on the medium voltage side manufactured by Schneider, including 1 exposed compartment LBS 630A and exposed compartment LBS 200A + lead protection tube</h4>
<p><img loading="lazy" decoding="async" class="size-full wp-image-477 aligncenter tie-appear lazyloaded" src="https://e-tranle.vn/wp-content/uploads/TBA-Taiky_2.jpg" sizes="(max-width: 800px) 100vw, 800px" srcset="https://e-tranle.vn/wp-content/uploads/TBA-Taiky_2.jpg 800w, https://e-tranle.vn/wp-content/uploads/TBA-Taiky_2-768x576.jpg 768w" alt="" width="800" height="600" data-ll-status="loaded" /></p>
<h4>The terminal uses LBS with SCADA function combined with FCO to switch and protect the power source.</h4>
<p><img loading="lazy" decoding="async" class="size-full wp-image-478 aligncenter lazyloaded tie-appear" src="https://e-tranle.vn/wp-content/uploads/TBA-Taiky_5.jpg" alt="" width="600" height="800" data-ll-status="loaded" /></p>
<h4>Power metering system using 3PT and 3 CT medium voltage combined with electronic galvanometer mounted on floating pole</h4>
<p><img loading="lazy" decoding="async" class="size-full wp-image-479 aligncenter lazyloaded tie-appear" src="https://e-tranle.vn/wp-content/uploads/TBA-Taiky_6.jpg" alt="" width="600" height="800" data-ll-status="loaded" /></p>
<p>The project is designed by  Tran Le Electrical Engineering Co., Ltd  with a package of design &#8211; construction and energizing and put into use in August 2019.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>856KWp grid-tied solar power system – Cu Chi, Ho Chi Minh City</title>
		<link>https://e-tranle.vn/en/project/he-thong-dien-nang-luong-mat-troi-hoa-luoi-856kwp-cu-chi-tp-ho-chi-minh/</link>
		
		<dc:creator><![CDATA[Trần Đình Quân]]></dc:creator>
		<pubDate>Sat, 30 Oct 2021 06:47:56 +0000</pubDate>
				<guid isPermaLink="false">https://e-tranle.vn/du-an/he-thong-dien-nang-luong-mat-troi-hoa-luoi-856kwp-cu-chi-tp-ho-chi-minh/</guid>

					<description><![CDATA[Solar power system connected to the grid 856KWp, Cu Chi District, Ho Chi Minh City. Project information: -Project name: Solar power system connected to the grid 856 KWp – Cu Chi Ward, City. Ho Chi Minh City -Address: Tan Phu [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>Solar power system connected to the grid 856KWp, Cu Chi District, Ho Chi Minh City.</p>
<p>Project information:</p>
<p>-Project name: Solar power system connected to the grid 856 KWp – Cu Chi Ward, City. Ho Chi Minh City<br />
-Address: Tan Phu Trung Industrial Park, Tan Phu Trung Commune, Cu Chi District, Ho Chi Minh City.</p>
<div id="attachment_690" class="wp-caption aligncenter">
<p><img loading="lazy" decoding="async" class="wp-image-690 size-full tie-appear lazyloaded" src="https://e-tranle.vn/wp-content/uploads/Du-an-nang-luong-mat-troi-cu-chi-hcm.jpg" sizes="(max-width: 800px) 100vw, 800px" srcset="https://e-tranle.vn/wp-content/uploads/Du-an-nang-luong-mat-troi-cu-chi-hcm.jpg 800w, https://e-tranle.vn/wp-content/uploads/Du-an-nang-luong-mat-troi-cu-chi-hcm-768x576.jpg 768w" alt="" width="800" height="600" aria-describedby="caption-attachment-690" data-ll-status="loaded" /></p>
<p>Solar power system 856KWP &#8211; Tan Phu Trung Industrial Park.</p>
<ul>
<li>Power: 856 KWp.</li>
<li>Solar Panels: Sunpower 405Wp.</li>
<li>Inverter: Sungrow 110 KW.</li>
<li>Completion: December 2020.</li>
</ul>
</div>
<div id="attachment_691" class="wp-caption aligncenter">
<p><img loading="lazy" decoding="async" class="wp-image-691 size-full tie-appear lazyloaded" src="https://e-tranle.vn/wp-content/uploads/Du-an-nang-luong-mat-troi-cu-chi-hcm-3.jpg" sizes="(max-width: 800px) 100vw, 800px" srcset="https://e-tranle.vn/wp-content/uploads/Du-an-nang-luong-mat-troi-cu-chi-hcm-3.jpg 800w, https://e-tranle.vn/wp-content/uploads/Du-an-nang-luong-mat-troi-cu-chi-hcm-3-768x576.jpg 768w" alt="" width="800" height="600" aria-describedby="caption-attachment-691" data-ll-status="loaded" /></p>
<p>Solar power system 856KWP &#8211; Tan Phu Trung Industrial Park.</p>
<p>The project was designed by  Tran Le Electrical Engineering Co., Ltd., supplied materials, built a package, completed and put into use in December 2020.</p>
</div>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>9.62KWp . grid-tied solar power system</title>
		<link>https://e-tranle.vn/en/project/he-dien-nang-luong-mat-troi-hoa-luoi-9-62kwp/</link>
		
		<dc:creator><![CDATA[Trần Đình Quân]]></dc:creator>
		<pubDate>Sat, 30 Oct 2021 06:47:47 +0000</pubDate>
				<guid isPermaLink="false">https://e-tranle.vn/du-an/he-dien-nang-luong-mat-troi-hoa-luoi-9-62kwp/</guid>

					<description><![CDATA[9.62KWp grid-tied solar power system project is located at Nguyen Minh Hoang Street, Ward 12, Tan Binh District, City. HCM. The investor wants to save monthly electricity costs as well as use green, clean energy to reduce the temperature inside [&#8230;]]]></description>
										<content:encoded><![CDATA[<p>9.62KWp grid-tied solar power system project is located at Nguyen Minh Hoang Street, Ward 12, Tan Binh District, City. HCM. The investor wants to save monthly electricity costs as well as use green, clean energy to reduce the temperature inside the house. In order to meet that requirement, Tran Le engineers have researched, designed and provided investment and technical advice to the Investor. The investor has decided to invest in a solar power system with a capacity of 9.62 KWp.</p>
<p>Project information:</p>
<ul>
<li>Project name: 9.62KWp grid-tied solar power system – Tan Binh District, City. Ho Chi Minh City</li>
<li>Address: Nguyen Minh Hoang Street, Ward 12, Tan Binh District, City. HCM.</li>
<li>Power: 9.62 KWp.</li>
<li>Completed: April 2019.</li>
</ul>
<p>The system uses 26 Mono 72 Cell 370Wp 1000V solar panels manufactured by S-Energy / Korea.</p>
<p><img loading="lazy" decoding="async" class="aligncenter wp-image-587 size-full tie-appear lazyloaded" src="https://e-tranle.vn/wp-content/uploads/Pin-nang-luong-mat-troi-A-Chau1.jpg" sizes="(max-width: 800px) 100vw, 800px" srcset="https://e-tranle.vn/wp-content/uploads/Pin-nang-luong-mat-troi-A-Chau1.jpg 800w, https://e-tranle.vn/wp-content/uploads/Pin-nang-luong-mat-troi-A-Chau1-768x576.jpg 768w" alt="" width="800" height="600" data-ll-status="loaded" /></p>
<p>The plan of arranging panels at an angle optimizes the area and ensures aesthetics while still giving high performance.</p>
<p><img loading="lazy" decoding="async" class="aligncenter wp-image-586 size-full tie-appear lazyloaded" src="https://e-tranle.vn/wp-content/uploads/Pin-nang-luong-mat-troi-A-Chau.jpg" sizes="(max-width: 800px) 100vw, 800px" srcset="https://e-tranle.vn/wp-content/uploads/Pin-nang-luong-mat-troi-A-Chau.jpg 800w, https://e-tranle.vn/wp-content/uploads/Pin-nang-luong-mat-troi-A-Chau-768x576.jpg 768w" alt="" width="800" height="600" data-ll-status="loaded" /></p>
<p>The truss system is made from I-shaped steel and a 2.5 m high galvanized box to ensure the sturdiness, aesthetics and take advantage of the space below the solar panel.</p>
<p><img loading="lazy" decoding="async" class="aligncenter wp-image-584 size-full tie-appear lazyloaded" src="https://e-tranle.vn/wp-content/uploads/IMG_20190520_0915411.jpg" sizes="(max-width: 800px) 100vw, 800px" srcset="https://e-tranle.vn/wp-content/uploads/IMG_20190520_0915411.jpg 800w, https://e-tranle.vn/wp-content/uploads/IMG_20190520_0915411-768x576.jpg 768w" alt="" width="800" height="600" data-ll-status="loaded" /></p>
<p>3P-10kW Sunny Tripower grid-tied inverter manufactured by SMA (Germany).</p>
<p><img loading="lazy" decoding="async" class="aligncenter wp-image-585 size-full lazyloaded tie-appear" src="https://e-tranle.vn/wp-content/uploads/Inverter-A-Chau1.jpg" sizes="(max-width: 800px) 100vw, 800px" srcset="https://e-tranle.vn/wp-content/uploads/Inverter-A-Chau1.jpg 800w, https://e-tranle.vn/wp-content/uploads/Inverter-A-Chau1-768x576.jpg 768w" alt="" width="800" height="600" data-ll-status="loaded" /></p>
<p>The project was designed, supplied and built by  Tran Le Electrical Engineering Co., Ltd., completed and tested in April 2019.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
