The 5.2KWp grid-tied solar power system project is located at TT. My Phuoc, Ben Cat Ward, Binh Duong Town. The investor wants to save monthly electricity costs as well as use green, clean energy to reduce the temperature inside the […]
30 October, 2021See more
The 9.75 KWp grid-tied solar power system project is located at Nguyen Minh Hoang Street, Ward 12, Tan Binh District, City. HCM. The investor wants to save monthly electricity costs as well as use green, clean energy to reduce the […]
30 October, 2021See more
The project 8.45 KWp grid-tied solar power system is located at Street 13, Binh Tri Dong B, Binh Tan, Ho Chi Minh. The investor wants to save the company’s monthly electricity costs as well as use green, clean energy […]
30 October, 2021See more
Project information Project name: Solar power system connected to the grid of FE . factory Location: VSIP 2A Industrial Park, Binh Duong Power : 391.2 KWp Completion date: April 2019 The project uses 1008 Sunpower P19-390W panels, 1500VDC, spread on […]
30 October, 2021See more
The project is a house built in a place where there is no electricity to the grid. The investor (investor) wishes to use 100% solar energy to supply electricity for loads including: 3 air conditioners, refrigerators, electric stoves, televisions, washing […]
30 October, 2021See more
Solar power system connected to the grid 1.16 MWp, Phu An Thanh Industrial Park, Ben Luc District, Long An T. Project information: Project name: 1.16 MWp grid-tied solar power system, Phu An Thanh Industrial Park, Ben Luc District, Long An […]
2 October, 2021See more